Top of page top Next Previous


Clear Creek Storage Company, LLC   Third Revised Sheet No. 44 : Effective
FERC Gas Tariff Supersedes Second Revised Sheet No. 44
Clear Creek Storage Company, LLC


                   GENERAL TERMS AND CONDITIONS
                           (Continued)
   
     or if the pre-arranged offer is for the applicable maximum
     reservation charge and the full term of the release, then
     the pre-arranged Replacement Customer shall become the
     Replacement Customer.  If the pre-arranged release is for
     less than the applicable maximum reservation rate, and a
     better offer is received during the bid period, the pre-
     arranged Replacement Customer shall have one hour from the
     time notification is received from Clear Creek to match the
     better offer.  If the pre-arranged bidding Customer fails to
     match the better offer, then the bidding Customer that
     presented the better offer shall become the Replacement
     Customer.
   
               (4) A Releasing Customer should not be able to
     specify an extension of the original bid period or the pre-
     arranged deal match period, without posting a new release.
   
          4.10 Volumetric Release.  Customer may release capacity
     on a volumetric basis provided:
   
               (1) All requirements and conditions of the release
     are specified by the Releasing Customer in the release
     notice, including any minimum storage volume requirement.
   
               (2) The requirements and conditions specified by
     the Releasing Customer meet all of the requirements and
     conditions of this tariff.
   
               (3) The volumetric rate for release falls within
     the minimum and maximum rate shown on the Statement of Rates
     of this tariff.
   
               (4) Clear Creek will bill the volumetric rate for
     volumes actually received by Clear Creek for the account of
     the Replacement Customer; or the minimum storage volume
     requirement, if volumes actually received are less than the
     required minimum storage requirement.
   
               (5) The Replacement Customer shall remain fully
     responsible for all usage charges incurred.







Issued by: M.B. McGinley, Vice President
Issue date: 02/24/09 Effective date: 02/24/09