Top of page top Next Previous


Clear Creek Storage Company, LLC   Original Sheet No. 66 : Effective
FERC Gas Tariff
Clear Creek Storage Company, LLC


               GENERAL TERMS AND CONDITIONS
                           (Continued)
   
     avoid any inaccuracy in the determination of the volume of
     Gas injected and withdrawn.  The accuracy of all measuring
     equipment shall be verified by Operator at reasonable
     intervals, and if requested, in the presence of
     representatives of the other party.  However, neither Clear
     Creek nor Customer shall be required to verify the accuracy
     of such equipment more frequently than once in any 90-Day
     period.
   
          Any party desiring a special test of any measuring
     equipment will promptly notify the other party and the
     parties shall then cooperate to secure a prompt verification
     of the accuracy of such equipment.  Transportation and
     related expenses involved in the testing of meters shall be
     borne by the requesting party.
   
          14.8 For purposes of this sub section, Operator shall
     be the owner of the equipment referenced herein, the agent
     of such owner, or any other person as the parties may agree
     in writing.
   
              (1)  If upon testing, Operators measuring
     equipment is found to be in error, such errors shall be
     taken into account in a practical manner in computing the
     deliveries.  If the resultant aggregate error in the
     computed receipts or deliveries is not more than 0.5% for
     chromatograph or calorimeter and 2% for other measuring
     equipment, then previous receipts or deliveries shall be
     considered accurate.  All equipment shall, in any case, be
     adjusted at the time of the test to record correctly.
   
             (2)  If the resultant aggregate error in computing
     receipts or deliveries exceeds 0.5% for chromatograph or
     calorimeter and 2% for other measuring equipment, at a
     recording corresponding to the average hourly rate of Gas
     flow for the period since the last preceding test, the
     previous recordings of the equipment shall be corrected to
     zero error for any period which is known definitely or
     agreed upon.  Such correction shall be for a period
     extending over one-half of the time elapsed since the date
     of the last test.
   
        14.9 If any measuring equipment is out of service, or
     is found registering inaccurately and the error is not
     determinable by test, previous recordings of receipts or
     deliveries through the equipment shall be determined as
     follows:







Issued by: M.B. McGinley, Vice President
Issue date: 03/30/00 Effective date: 06/01/00